
Springer Gabler
Multi-Stage Simultaneous Lot-Sizing and Scheduling: Planning of Flow Lines with Shifting Bottlenecks
Product Code:
9783658020880
ISBN13:
9783658020880
Condition:
New
$61.47

Multi-Stage Simultaneous Lot-Sizing and Scheduling: Planning of Flow Lines with Shifting Bottlenecks
$61.47
In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed.
Author: Florian Seeanner |
Publisher: Springer Gabler |
Publication Date: May 29, 2013 |
Number of Pages: 182 pages |
Binding: Paperback or Softback |
ISBN-10: 3658020881 |
ISBN-13: 9783658020880 |